APPROVED APPROVED Director General Deputy Director General of the joint venture of the National Airline of "ASKON" the Republic of Uzbekistan I.V. Khamrakulov S.M. Sumbaev 2 July 1992 3 July 1992 R E P O R T N 16/92 on extrasensory works on extrasensory prediction of deviations in engines AI-25, prepared for rig trials, carried out by Grabovoy Grigoriy Petrovich in March 1992 We, the undersigned,the executor of the work the extrasense G.P.Grabovoy and representatives of the Customer: a deputy shop N 5 manager of the engine-testing station of the plant N 243 of the Civil Aviation Base O.N.Blazhko, a head of the engineering and informaition centre of the air and technical base of the National Airline of the Republic of Uzbekistan V.M.Saulkin, a senior project engineer of the engineering-information centre of Airline of the Republic of Uzbekistan S.V.Nemtzov and the foreman of the quality control department of the engine-testing station of the plant N 243 of the Civil Aviation V.A.Guzev, drew up the present report that G.P.Grabovoy carried out undermentioned extrasensory works in March 1992 on the agreement between the joint Soviet-American enterprise "ASKON" and the Uzbek Department on Civil Aviation N 9 of 02.12.1991 on the subject "Non-traditional methods of aviation technique diagnostics". In March 1992 G.P.Grabovoy carried out works on extrasensory prediction of deviations in engines AI-25 at the engine-testing station of the plant 243 of the Civil Aviation. The aim of the work was to make a diagnostics of engines and detect deviations in them before tests to eliminate faults at the case of necessity before tests. G.P.Grabovoy made extrasensory diagnostics of four engines on 16.03.1992. The extrasensory information of G.P.Grabovoy on engine AI-25 N 5422165: "During the tests the deviation in the works of the air-gas flue (rotor high pressure compressor's rotor) will be detected". According to the tests results the following was written in the book of tests results registration of engines: "The engine N 5422165 was tested on 17.03.1992: During the tests the deviations in the works of the high pressure compressor's rotor were detected. The engine was taken off the tests". The extrasensory prediction of G.P.Grabovoy was confirmed. The extrasensory information by G.P. Grabovoy on the engine AI-25 N 5142076: "During the tests the faults won't be detected". On results of test in the Book of engine test registration results the following was registered: Sheet N 2 Report N 16/92 "The engine AI-25 N 5142076 was tested on 19.03.1992. During the tests the deviations were not detected". The extrasensory prediction by G.P.Grabovoy was confirmed. The extrasensory prediction by G.P.Grabovoy on the engine AI-25 N 51442039: "During the tests faults will not be decected". According to the tests results the following was written in the register of results: "The engine N 5142039 was tested on 18.03.1992 During the tests deviations weren't detected". The extrasensory prediction by G.P. Grabovoy was confirmed. The extrasensory information by G.P. Grabovoy on the engine AI-25 N 5612144: "During the tests the deviation of the air-gas flue (rotor KVD) will be detected". According to the results of tests the following was registered in the register of tests results: "The engine N 5612144 was tested on 17.03.1992: During the tests the deviations on the rotor KVD work were detected, the engine was taken off the tests". The extrasensory prediction by G.P.Grabovoy was confirmed. Thus all extrasensory information by G.P.Grabovoy obtained during his work on extrasensory prediction of deviations in the engine of AI-25 before tests was fully confirmed. The full confirmation of prediction by Grabovoy allows to conclude that it is expedient to carry out such works in the future, the extrasensory diagnostics by G.P.Grabovoy on engine before tests will allow to considerably reduce expenses, connected with the faulty aircraft engines transportation, test and return to the engine-test station. Executor of works Representatives of the Customer: G.P.Grabovoy Deputy shop N 5 manager of the engine-test station of the plant N 243 of Civil Aviation O.N.Blazhko Head of engineering and information centre of aviation technical base of National Airlines of the Republic of Uzbekistan V.M.Saulkin Senior project engineer of engineering and information centre of aviation and technical base of the National Airline of the Republic of Uzbekistan S.V.Nemtzov Foreman of the engine-test station of the plant N 243 of Civil Aviation V.A.Guzev